1.
Enclosure 3.
HONGKONG.
PRATA EAST RECLAMATION SCHEME.
COMPARISON
BETWEEN –
Scheme agreed to by thoso Persons entitled to perutaipaw.
and referred to in Ordinance No. 17 of 1921
and
Scheme "D" approved by the Secretary of State
for the Colonies and referred to in Despatchon No.
365 of 21st October, 1913 and No. 367 of 24th December
1913.
Attached are:-
(a). Oopy of Plan marked "D" showing the Scheme referred
to in the above-mentioned Despatches.
441
(b). Plan marked "E" showing the Soheme agreed to by those
Persons entitled to participate and referred to in
the above-mentioned Ordinance.
II. From the above two Plans it will be noted that the principal
points of difference between the two Schemes are:-
(1). Whereas Plan "p" shows the Scheme as terminating at
+
Bowrington Janal Plan "E" shove the Soheme extended
to its natural and inevitable termination at East
Point.
Scheme "D" was shown as terminating at
Bowrington Canal for legal reasons in connection
with the terms on which the Owners of Marine Lot
No. 52 and Inland Lot No. 29 would be allowed
to participate in the Scheme,
By the conversion of a portion of Inland Lob No.
29 into a Marine Lot (Vide Despatches No. 49 of
10th February, 1915 and No. 86 of 1st April,
1915).